11.04.2008
Contract on delivery of third STS Gantry crane was signed today between Muuga CT and Knecranes. The delivery time is November 2009.
| ![]() |
<< Current News |
<< News Archive
STS contract signing with Konecranes11.04.2008 Contract on delivery of third STS Gantry crane was signed today between Muuga CT and Knecranes. The delivery time is November 2009.
<< Current News |
<< News Archive
|
||||
| CTQI ISO 9001 | ||||
| Developed by EDS Systems OÜ |
|
|||